Additional Works for construction of 1 no. of 132kV railway traction bay at 132KV GSS Behiating:- a) Dismantling of existing road through switchyard along with construction of new road through switchyard of width 4m and construction of road through switchyard of width 2.5 m.
b) Dismantling of existing Storm Water Drain and construction of new Storm Water Drain adjacent to the new proposed road.